Polyester cladding aedicula with mixed structure : steel and composite.
All arrived pre-assembled and then craned in half a day.
The structure integrates 3 antennal sectors with RRU and 1 MW.
Volx Plan
Location : Bègles - Mussonville
Year : 2016
Visite technique / Technical inspection
Visite technique / Technical inspection
Edicule installé / Installed chamber
Edicule installé / Installed chamber
Structure métallique / Steel structure
Structure métallique / Steel structure
Fixation sur l'édicule existant / Fixing on the existing chamber
Fixation sur l'édicule existant / Fixing on the existing chamber